Click on a photo to enlarge.
A homeowner in Concord, New Hampshire, owns their childhood home that was an heirloom for their family. The home was built in the 1860s and the homeowner grew up in this home. Since their childhood, over 40 years ago, the homeowner noticed the floors sinking and sloping. The homeowner decided to call EFS for a free inspection and our Design Specialist recommended installing SmartJacks and Supplemental Beam into their basement to lift and level the floor system.
An owner of a home that is over 100 years old in Concord, New Hampshire, had floors on the main level that were sagging. The homeowners decided to call EFS for a free inspection of the home. Our Design Specialist Victor recommended installing 6 SmartJacks and 28' of Supplemental beam into the basement to eliminate the sagging of the floors on the main level of the home.
This homeowner in Concord, New Hampshire, had concerns with their floor system. They decided to call EFS for a free inspection and our Design Specialist recommended installing 3 SmartJacks with a 9' Supplemental beam.
Our Installation Team installed the SmartJacks and Supplemental beam and lifted the floor system to add stability and eliminate sagging in the floors.
The owner of a heirloom home in Concord, New Hampshire wanted to make sure their home 1850s home would be able to be structurally sound for the next 150 years. The owner of the home decided to call EFS for a free inspection. Our Design Specialist recommended some foundation repair solutions to add stability to the interior and exterior of the home. We recommended installing two sections of Masonry Block Walls to add strength to a section of the foundation wall that was beginning to fail.
A homeowner in Concord, New Hampshire purchased their 1900s home in 2016 and had steadily renovated and upgraded items around the home. They wanted to stabilize the floor system in the home so they called EFS for a free inspection. Our Design Specialist inspected the floor system in the basement and recommended installing 3 SmartJacks and a 16-foot Supplemental beam to stabilize the floors.